Installation Guide
All you need is a pair of Hands!
STEP 1:
Screw the spikes in one end of legs

STEP 2:
Insert M8 Screw from the countersunk side of the panel and turn the leg while pressing the M8 screw head from the other side.

STEP 3:
Gently position the first tier on floor and add floor protection pads by lifting the legs one by one.

STEP 4:
Position one of the rear legs of the second tier (One at the time).

STEP 5:
Position the other rear leg of the second tier (Applicable to four legs setup).

STEP 6:
Gently position both front legs on the M8 Screw Heads of the shelf below at the same time.

STEP 7:
Move the front legs to perfectly Position the spikes in the screw head holes.

STEP 8:
Repeat steps 4 to 7 for all other tiers.

STEP 9:
Fine-tune the leg adjustments. Once adjusted turn the washer to hold the position against the stainless steel cap.

